Water Floating Engineering and Solutions
NEWS
A professional production of pontoons, pontoons, photovoltaic pontoons, docks and water supplies production enterprises
Xiaguang: ten common problems of blow molding products
In the process of extrusion blow molding products, there will always be many technical problems. The following is to share with you the causes of these problems and the relative solutions, hoping to provide you with relevant suggestions to solve the problems.
Aug 25,2023
Xiaguang: Technical parameters of floating wharf
The composition of the buoy and the installation of corresponding accessories and iron pieces shall be determined according to the quantity of the project. Generally, the normal construction can be completed in 3 days within 500 square meters and 7 days between 500 square meters and 1000 square meters. (The above time does not include the production of iron facilities such as anchoring works, bulwark bridges, ship boards, railings, etc. of floating docks; The above-mentioned works shall be finalized 20 days in advance, and then the design drawings provided by our company shall be contracted out for customization.
Nov 17,2022